Installing roof felt paper—or asphalt-saturated underlayment—is a critical weatherproofing phase that serves as the secondary drainage plane beneath shingles. Proper application requires precise overlapping of horizontal courses and secure fastening patterns to ensure the assembly meets ASTM D226 or D4869 standards for moisture resistance and secondary water shedding.


Pre-Installation Site Requirements and Essential Materials

Successful installation depends on a clean, dry, and structurally sound roof deck. If the plywood or OSB sheathing is damaged or exhibits soft spots, it must be replaced prior to underlayment installation to ensure fastener holding power and structural integrity.



  • Essential Materials:

    • ASTM D226 Type I (15 lb) or Type II (30 lb) asphalt-saturated organic felt.
    • Plastic-capped roofing nails (common for high-wind areas) or 1-inch diameter plastic cap staples.
    • Drip edge flashing (pre-installed at eaves and rakes).
  • Required Tools:

    • Roofing hammer or pneumatic cap stapler.
    • Utility knife with hook blades for precise cutting.
    • Chalk line for layout alignment.
    • PPE: OSHA-compliant harness, shock-absorbing lanyard, and high-traction roofing shoes.
  • Performance Benchmarks:

    • Duration: Approximately 2–4 hours for a standard 1,500-square-foot roof.
    • Environment: Install only during clear weather; felt paper absorbs moisture and will wrinkle if left exposed to rain, leading to potential "telegraphing" through asphalt shingles.

Procedural Workflow for Underlayment Application



Step 1: Installing the Drip Edge

Before the felt touches the roof, install the metal drip edge along the eaves. The drip edge should be nailed at the edge of the roof deck. Once the eave drip edge is secure, you will lay the felt paper over it, allowing a small amount to hang over the edge to promote water runoff into the gutters. On the rake edges (the sloped sides of the roof), the felt paper should be laid down first, and the drip edge should be installed over the top of the felt to prevent wind-driven rain from entering the edge of the deck.



Step 2: Positioning the Initial Course

Start at the lowest point of the roof—the eave. Roll the felt paper horizontally across the eave, keeping the bottom edge flush with the drip edge or slightly overhanging by about 1/2 inch. Ensure the material is taut but not stretched, as cold temperatures may cause the felt to contract. If the felt is wrinkled, smooth it out immediately, as ridges will be visible under the finished shingle layer.



Step 3: Fastening the Underlayment

Proper fastening is vital to prevent movement. Secure the felt with plastic-capped nails spaced approximately 8 to 12 inches apart along the top and bottom edges.

Warning: Avoid over-driving the nails. The plastic cap should sit flush against the paper surface without tearing the felt. Driving the fastener too deep creates a pocket that can trap water, leading to localized rot over time.



Step 4: Mastering the Overlap Pattern

To ensure the roof remains watertight, you must master the overlap. For Type I (15 lb) felt, a minimum overlap of 2 inches on horizontal laps and 4 inches on vertical (end) laps is required. For roofs with slopes between 2:12 and 4:12, double-layering the felt is industry-recommended to provide a robust moisture barrier. Always lay the upper sheet over the lower sheet so that water flowing down the roof travels over the seams rather than under them, acting like shingles.



Step 5: Sealing Valleys and Penetrations

Valleys are the highest-risk areas for leaks. Before laying the main felt courses, install a separate, full-length strip of underlayment vertically down the center of the valley. Extend this layer at least 18 inches onto the adjoining roof slopes on each side. When bringing your horizontal courses into the valley, trim them at the valley center and ensure they overlap the valley liner by at least 6 inches. For pipe penetrations, cut the felt to fit snugly around the pipe and seal the base with roofing cement or a dedicated pipe flange boot.


Installation Manual-Zip System Sheathing-Wall And Roof - FBQA

Installation Manual-Zip System Sheathing-Wall And Roof - FBQA

Underlayment Specifications and Material Selection

Choosing the correct weight and type of felt depends on your local climate, roof pitch, and the expected lifespan of the roof assembly.



Material Type Weight/Sq Primary Use Climate Suitability
ASTM D226 Type I 15 lb Standard roofing Mild to moderate climates
ASTM D226 Type II 30 lb High-durability/High-pitch Harsh, windy, or heavy snow
Synthetic Underlayment Varies Premium projects High-humidity/Long-term UV
Self-Adhered Membrane Varies Eaves/Valleys Leak-prone high-ice zones

Common Site Failures and Field Fixes



  • Failure: Wrinkling and Buckling.

    • Root Cause: The felt absorbed moisture before shingle application or was installed too tightly.
    • Actionable Fix: Slit the wrinkles with a utility knife to allow the material to lay flat, then apply a small patch of felt over the slit using roofing adhesive or a cap nail.
  • Failure: Fastener Pull-through.

    • Root Cause: Using standard roofing nails without plastic caps in high-wind areas.
    • Actionable Fix: Replace improperly fastened sections with plastic-capped fasteners. If the hole is enlarged, move the fastener 2 inches to the side to regain structural grip.
  • Failure: Improper Seam Orientation.

    • Root Cause: Laying the top layer under the bottom layer, creating a "water shelf."
    • Actionable Fix: Carefully pry the seam apart and install a new strip of felt over the top, properly overlapping the joint by at least 4 inches.

Frequently Asked Questions



Can I install shingles directly over the roof deck without felt paper?

While some building codes historically allowed this, it is highly discouraged and often violates modern residential building codes. Felt paper serves as a secondary moisture barrier that protects the deck if shingles are blown off or if ice dams occur, and it acts as a slip sheet to prevent shingles from sticking to the roof deck.



Does the felt paper need to cover the entire roof deck?

Yes, for maximum protection, the entire roof deck should be covered with underlayment. Partial coverage leaves portions of the wood deck vulnerable to humidity changes, which can lead to warping or premature decay of the OSB or plywood.



How long can felt paper be exposed to the sun?

Felt paper is not UV-resistant and will begin to degrade, crack, or lose its asphalt saturation if left exposed to direct sunlight for more than a few days. Aim to cover the underlayment with your finished roofing material as soon as possible after installation.



Is 30 lb felt always better than 15 lb felt?

While 30 lb felt is thicker and more resistant to tearing during the installation process, it is also heavier and less breathable. 30 lb is generally preferred for steeper roofs or areas with high wind, while 15 lb is sufficient for standard, code-compliant residential roofs.

Ensure Long-Term Roof Integrity

Proper installation of felt paper is the foundational step in protecting your home from moisture intrusion and structural degradation. Consult your local building department to ensure your chosen underlayment thickness and fastening patterns meet specific regional wind and fire codes before beginning your project.