Installing cedar shake siding requires meticulous moisture barrier preparation, exact horizontal chalk lines, and precise spacing tolerances to accommodate natural wood expansion. This comprehensive guide outlines the professional techniques needed to achieve a weather-tight, aesthetically striking cedar exterior that lasts for decades.


Pre-Operation & Equipment Checklist

Achieving a professional-grade cedar shake siding installation demands proper preliminary planning, high-grade materials, and specialized tools. Before hanging the first course, ensure all structural sheathing is clean, dry, and protected by a breathable weather-resistive barrier.



  • Essential Equipment: Pneumatic siding nailer or stainless steel ring-shank nails, chalk lines, hammer, utility knife, block plane, tin snips, tape measure, and a multi-directional framing square.
  • Materials & Specifications: Grade A Western Red Cedar or Northern White Cedar shingles (typically 16, 18, or 24 inches long), stainless steel or hot-dipped galvanized fasteners, 3D or 4D casing nails, woven breather-type house wrap, and corrugated plastic or nylon rainscreen mesh for optimal ventilation.
  • Prerequisites & Standards: Exterior walls must feature a continuous weather-resistive barrier. Local building codes generally mandate a minimum 1-inch clearance between the bottom of the shakes and finished grade or decks.
  • Scope & Benchmarks: Plan for an estimated timeframe of 3 to 5 days for a standard 500-square-foot wall section, operating on a budget prioritizing premium-grade fasteners to prevent tannin bleed and premature fastener failure.

Step-by-Step Cedar Siding Installation Workflow



Step 1: Weather-Resistive Barrier and Rainscreen Installation



  1. Install an approved weather-resistive house wrap horizontally across the exterior plywood or OSB sheathing, overlapping upper layers over lower layers by at least 6 inches.
  2. Fasten the house wrap securely using corrosion-resistant cap staples according to manufacturer specifications to prevent moisture infiltration.
  3. Install a vertical rainscreen mat or furring strips directly over the house wrap if required by local humidity conditions, ensuring an unimpeded drainage plane behind the cedar shakes.


Step 2: Establishing Baseline and Starter Course Layout



  1. Measure up from the lowest point of the wall, accounting for the required clearance above grade, and snap a continuous level chalk line around the perimeter.
  2. Install a heavy-duty starter strip or double-layer starter course of shakes, extending the bottom edges approximately 1/2 inch to 3/4 inch below the sill plate to act as a proper drip edge.
  3. Leave a 1/4-inch expansion gap between individual starter shingles to allow for seasonal wood movement without buckling.


Step 3: Snapping Exposure Lines and Laying Subsequent Courses



  1. Determine your desired weather exposure based on shake length (e.g., 5-1/2 inches for 16-inch shingles, 7-1/2 inches for 24-inch shingles) and snap horizontal chalk lines up the wall.
  2. Sort through your cedar bundles to mix widths, ensuring a visually balanced facade without heavy clustering of overly narrow or wide shakes.
  3. Position each shake along the chalk line, leaving a 1/4-inch expansion space between adjacent shakes and staggering vertical joints by a minimum of 1-1/2 inches from the course below.


Step 4: Driving Fasteners and Managing Corner Details



  1. Drive two ring-shank, rust-resistant nails per shake, positioned approximately 3/4 inch in from each edge and 1 inch above the butt line of the succeeding course.
  2. Sink nail heads flush with the wood surface without crushing or indenting the wood fibers, which weakens holding power and traps moisture.
  3. Intersect outside and inside corners using alternating overlapping corner boards or woven mitered joints for a clean, architectural finish.

Cedar Shake Siding Around Windows at Patricia Mack blog

Cedar Shake Siding Around Windows at Patricia Mack blog

Technical Specifications and Material Comparison



Shingle Length Recommended Exposure Minimum Pitch Fastener Requirement Spacing Tolerances
16 Inches (Fivex) 3-3/4 to 5 Inches 4:12 Pitch 3D Stainless Steel 1/4 Inch Expansion Gap
18 Inches (Perfection) 4-1/4 to 5-1/2 Inches 4:12 Pitch 3D Stainless Steel 1/4 Inch Expansion Gap
24 Inches (Royal) 5-3/4 to 7-1/2 Inches 4:12 Pitch 4D Stainless Steel 1/4 Inch Expansion Gap

Common Site Failures and Field Fixes



  • Root Cause: Fastening shingles too tightly without adequate side-to-side spacing.

    • Actionable Fix: Remove buckled shakes, rip down edges to re-establish a consistent 1/4-inch expansion gap, and re-nail with proper clearance.
  • Root Cause: Using standard electro-galvanized or reactive steel nails causing black streaks.

    • Actionable Fix: Extract reactive fasteners entirely using a shingle ripper, treat exposed wood with oxalic acid to remove tannin stains, and replace with grade 316 stainless steel ring-shank nails.
  • Root Cause: Insufficient vertical joint staggering between adjacent courses.

    • Actionable Fix: Carefully pry off offending shakes and insert new units cut to span across the joints, maintaining the mandatory 1-1/2 inch offset minimum.

Frequently Asked Questions



Do cedar shake shingles require staining or sealing immediately?

Western Red Cedar contains natural oils that make it naturally resistant to decay and insects. While you can leave them unfinished to weather to a silvery-gray patina, applying a breathable, oil-based semi-transparent stain or UV-inhibiting sealer extends their lifespan and preserves the warm wood tones.



What is the purpose of leaving gaps between individual cedar shakes?

Cedar wood expands when it absorbs moisture during wet weather and contracts as it dries out. Leaving a 1/4-inch gap between individual shakes gives the wood room to move, preventing the siding from buckling, warping, or cracking over time.



Can I install cedar shakes directly over old siding?

Installing cedar shakes over old siding is generally discouraged because it prevents proper installation of a continuous weather-resistive barrier and adequate drainage. It is always best to strip down to the bare sheathing to inspect framing and install a proper rainscreen and house wrap.



How do I prevent black stains around the nail heads?

Black stains occur when reactive metals like standard steel react with natural tannins in the cedar when exposed to moisture. To prevent this entirely, always use high-grade 316 stainless steel or hot-dipped galvanized fasteners specifically rated for cedar applications.

Elevate Your Exterior with Premium Cedar Siding

Mastering the art of cedar shake installation ensures a structurally sound, weather-resistant, and visually breathtaking exterior finish that enhances any architectural style. Equip yourself with top-tier fasteners, adhere strictly to moisture management protocols, and enjoy a timeless facade built to withstand the elements for decades.


cedar-shake-siding-with-care-and-maintenance-cedar-shake-shingles-cedar ...

cedar-shake-siding-with-care-and-maintenance-cedar-shake-shingles-cedar ...

Read also: Stricter security measures hit federal detention center seatac