How To Get Welding Certified: Step-by-Step AWS & ASME Qualification Guide

How To Get Welding Certified: Step-by-Step AWS & ASME Qualification Guide

CWB Certified Welding in Vancouver, CSA W47.1 | Jeff and Simon Ironworks

Earning a recognized welding certification requires selecting an industry-standard code (such as AWS D1.1 or ASME Section IX), mastering the designated process and position, and successfully passing a standardized performance qualification test. Candidates must prepare and join a test coupon in accordance with a strict Welding Procedure Specification (WPS) and pass both visual inspection and destructive bend or non-destructive examination. Attaining this credential validates technical competence, ensuring structural integrity and compliance across industrial, commercial, and energy sector operations.


Prerequisites, Industry Standards, and Testing Gear Setup

Before scheduling a performance qualification test, a candidate must establish the specific governing code required by their target industry. The American Welding Society (AWS), American Society of Mechanical Engineers (ASME), and American Petroleum Institute (API) enforce distinct criteria based on structural, pressure vessel, or cross-country pipeline applications. Achieving a passing score demands disciplined setup, proper protective equipment, and a precise understanding of joint geometry.



Mandatory Pre-Test Checklist



  • Essential PPE & Shop Tools:



    • Auto-darkening welding helmet (adjustable shade 9–13) or fixed shade glass lens matching the amperage range.
    • Heavy-duty split-cowhide leather welding jacket or sleeves and flame-resistant (FR) work shirt.
    • Top-grain cowhide or goat-skin welding gloves specified for the selected process (GMAW/FCAW vs. GTAW).
    • 4.5-inch angle grinder equipped with dedicated grinding wheels, flap discs, and wire wheels (stainless steel for stainless/aluminum; carbon steel for mild steel).
    • Fillet weld gauge set, Cambridge gauge, or digital dial calipers for precise root gap and bevel measurements.
    • Chipping hammer, steel hand wire brush, and heavy-duty C-clamps or locking pliers for material restraint.
  • Prerequisite Knowledge & Code Awareness:



    • Welding Procedure Specification (WPS): Ability to read and execute within listed parameters (amperage, voltage, travel speed, shield gas flow rate, filler metal classification).
    • Joint Preparation Standards: Familiarity with AWS D1.1 standard joint details (e.g., B-P2, C-P2) including bevel angle, root face (land), and root opening.
    • Nomenclature & Positions: Complete understanding of test position designations: 1G (flat groove), 2G (horizontal groove), 3G (vertical groove), 4G (overhead groove), 5G (horizontal fixed pipe), and 6G (45-degree inclined pipe).
  • Resource Benchmarks:



    • Estimated Financial Investment: $150 to $600 per individual test coupon, depending on the testing facility, material thickness, and non-destructive testing (NDT) requirements.
    • Preparation Timeline: 20 to 100 hours of targeted booth practice time, varying by process complexity and baseline welder dexterity.

The Practical Path to Welding Certification Execution

[Select Code & Process] ➔ [Review WPS] ➔ [Prepare Test Coupon] ➔ [Execute Weld Passes] ➔ [Undergo VT & Bend/NDT]



Step 1: Select the Target Code, Process, and Position

Identify the exact industry standard that aligns with your employment goals. Structural steel construction overwhelmingly utilizes AWS D1.1 (Carbon Steel) or AWS D1.2 (Aluminum). Boiler and pressure vessel fabrication adheres to ASME Section IX, while cross-country pipeline welding follows API 1104.

Select your welding process:



  • Shielded Metal Arc Welding (SMAW / Stick)
  • Gas Metal Arc Welding (GMAW / MIG)
  • Flux-Cored Arc Welding (FCAW)
  • Gas Tungsten Arc Welding (GTAW / TIG)

Choose the test position. Taking a 3G (vertical) and 4G (overhead) combination plate test under AWS D1.1 qualifies you for all plate positions (1G through 4G). Testing on a 6G pipe coupon (pipe inclined at 45 degrees without rotation) under ASME IX or API 1104 provides the broadest structural and piping qualification range.



Step 2: Review and Interpret the Welding Procedure Specification (WPS)

Every accredited test facility provides a WPS that dictates the essential and non-essential variables for the test. Deviating from these boundaries results in an automatic failure.



  1. Verify Material Metrics: Confirm the base metal specification (e.g., ASTM A36, A572, or A106 Grade B pipe) and material thickness ($T$).
  2. Verify Filler Metal: Select the exact electrode designation specified (e.g., E7018-1 for SMAW, E71T-1M for FCAW, or ER70S-6 for GMAW/GTAW).
  3. Set Electrical Parameters: Dial in the machine's direct current electrode positive (DCEP) or direct current electrode negative (DCEN) polarities, target voltage (e.g., 23–26V for FCAW), and wire feed speed or amperage range (e.g., 110–140A for 1/8" E7018).
  4. Confirm Gas Parameters: Set the shielding gas composition (e.g., 100% $CO_2$ or 75% Argon / 25% $CO_2$) and flow rate (30–40 CFH).

Pro-Tip: Always check the calibrated output of the welding machine using an external clamp meter if available, as analog machine dials can drift by as much as 10–15% from actual arc voltage and amperage.



Step 3: Prepare and Fit-Up the Test Coupon

Flawless joint fit-up is mandatory to pass destructive testing. Surface contaminants like mill scale, rust, oil, and moisture introduce hydrogen embrittlement and porosity into the weld pool.



  1. Grind Coupon Faces: Grind the bevel faces, root face, and minimum 1-inch border on the top and bottom surfaces of both plates down to bright, bare metal.
  2. Verify Bevel Angle: Ensure the total included joint angle matches the WPS, typically $45^\circ$ to $60^\circ$ ($22.5^\circ$ to $30^\circ$ single bevel per plate).
  3. Set Root Land and Root Opening: Establish a consistent root face (typically 1/16" to 1/8") and set the root gap using a dedicated spacer or filler rod wire (typically 1/16" to 1/8").
  4. Tack Weld the Plates: Apply small tack welds inside the bevel groove or on backing strips (if using AWS D1.1 with backing) at the extreme ends of the coupon to prevent joint angular distortion during heating cycles.
  5. Mount in Position: Clamp the coupon into the test fixture at the correct height and position (e.g., 3G vertical up). Once mounted and marked by the Certified Welding Inspector (CWI), do not move or rotate the coupon until the test is completed.

Warning: Changing the orientation or spatial position of the test coupon after the inspector has initialed the test setup constitutes immediate disqualification under AWS and ASME testing protocols.



Step 4: Execute the Root, Fill, and Cap Passes

Execute the welding sequence in strict adherence to interpass temperature limits and travel speeds.

+-------------------------------------------------------+ | CAP PASS: Smooth, complete coverage, no undercut | | FILL PASSES: Uniform depth, thorough side fusion | | HOT PASS: Cleans root, burns out trace slag | | ROOT PASS: Complete penetration, uniform burn-thru | +-------------------------------------------------------+



  1. Root Pass Execution: Establish proper arc length and electrode angle. Maintain a uniform keyhole (if open-root) to ensure 100% root penetration and complete tie-in to both sidewalls.
  2. Hot Pass Application: Perform the hot pass quickly after slag removal (for SMAW/FCAW) to burn out residual slag remnants trapped along the root edges and establish a smooth foundation for fill passes.
  3. Interpass Cleaning & Thermal Management: Thoroughly chip, wire brush, or grind each pass. Monitor the interpass temperature using temp-stick crayons or an infrared pyrometer to ensure it stays below the maximum limit (typically $550^\circ\text{F}$ / $288^\circ\text{C}$ for structural carbon steel).
  4. Fill Passes: Deposit staggered, overlapping stringer or weave beads. Maintain flat bead profiles to prevent deep valley trapping between passes. Stop fill passes approximately 1/16" below the flush surface of the plate.
  5. Cap Pass (Cover Pass): Apply the final cover pass. Ensure complete fill without underfill, achieving a uniform reinforcement height between 1/32" and 1/8" above the plate surface, extending past the toe of the bevel by approximately 1/16".


Step 5: Submit the Coupon for Inspection and Testing

After the final pass cools, clean the weld face thoroughly using a hand wire brush. Do not grind the face or root cap surfaces unless explicitly permitted by the governing code and inspector.



  1. Visual Inspection (VT): The CWI checks for surface cracks, porosity, incomplete fusion, undercut depth (must not exceed 1/32" under AWS D1.1), weld reinforcement height, and profile uniformity.
  2. Coupon Preparation for Destructive Testing: If VT passes, the coupon is cut into standard spec coupons (typically two side bends, or one face and one root bend) using a band saw or flame cutter.
  3. Machine Guided-Bend Test: The cut specimens are placed into a guided-bend test jig (plunger and die) and bent $180^\circ$ to evaluate ductility and internal joint integrity.
  4. Evaluation of Results: The CWI inspects the convex surface of the bent specimen. Discontinuities (cracks or open voids) exceeding 1/8" (3.2 mm) measured in any direction result in immediate failure.

How To Get Welding Inspector Certification - Coremymages

How To Get Welding Inspector Certification - Coremymages

Comparison of Major Welding Certification Standards



Standard / Code Application Field Common Test Coupon & Position Primary Inspection & Qualification Testing Allowable Discontinuity Thresholds
AWS D1.1 Structural Carbon Steel 3/8" or 1" Plate with Backing (3G & 4G combination) Visual Inspection (VT) + Guided Bend Test (Root/Face or Side) Undercut $\le 1/32"$; Open defects on bend convex surface $\le 1/8"$
ASME Sec IX Pressure Vessels & Boilers 2" or 6" Schedule 80 Pipe (6G Position, Open Root) VT + Guided Bend Test or Volumetric Radiographic (RT) Zero cracks/unfusion; Max porosity $\le 1/16"$; Bend defects $\le 1/8"$
API 1104 Cross-Country Pipelines 12" Outer Diameter Pipe (5G or 6G Open Root) VT + Tensile Strength + Nick-Break + Root/Face Bend Nick-break pocket voids $< 1/16"$; Total slag/porosity limits under code tables
AWS D1.2 Structural Aluminum Fabrication 3/8" 6061-T6 Plate (3G Vertical Up with Backing) VT + Macro-Etch Test + Guided Side-Bend Test No lack of fusion; Penetration complete to backing; Bend voids $\le 1/8"$

Field Inspection Failures and Corrective Adjustments



Discontinuity: Incomplete Root Penetration (Lack of Penetration)



  • Root Cause: Arc gap too large, travel speed excessively fast, amperage set too low on the machine, or an overly thick root land combined with an inadequate root opening (gap).
  • Actionable Fix: Increase welding current by 10–15 Amps. Reduce travel speed to allow the puddle to push through the back edge of the joint. Re-verify root fit-up geometry to ensure the root gap equals the diameter of the filler wire (e.g., 3/32" or 1/8").


Discontinuity: Excessive Undercut along the Cap Toes



  • Root Cause: Excessively high arc voltage, arc length held too long, improper torch angle, or failing to pause (dwell) briefly at the outer margins of a weave bead.
  • Actionable Fix: Lower arc voltage by 1–2 Volts or decrease amperage. Tighten the arc length (keep the nozzle or electrode close to the puddle). Hold the puddle at the edge of the weld toe for a full second to let the filler metal wash completely into the base metal before sweeping across.

Incorrect Torch Motion (Rapid Sweep) ➔ Sharp Groove Left at Toe (Undercut) Correct Torch Motion (Pause at Toes) ➔ Smooth Metal Wash & Transition



Discontinuity: Gross Porosity or Wormholes in the Weld Deposit



  • Root Cause: Shielding gas coverage loss (caused by shop drafts, incorrect CFH rate, or clogged gas nozzle/diffuser), contaminated base metal (grease/oil/mill scale), or moisture absorbed into low-hydrogen electrodes (e.g., wet E7018 rods).
  • Actionable Fix: Ensure E7018 electrodes are retrieved directly from a operating rod oven set at minimum $250^\circ\text{F}$ ($120^\circ\text{C}$). Set shielding gas flow between 35 and 40 CFH, set up draft shields, and use a dedicated wire wheel and solvent degreaser to prepare base metal 1 inch beyond the joint margins.


Discontinuity: Coupon Failure During Guided 180-Degree Bend Test



  • Root Cause: Interpass cold-lapping (lack of side fusion) caused by improper electrode angle, trapping slag between passes, or excessive heat input degrading base material mechanical properties.
  • Actionable Fix: Clean all slag thoroughly between passes using a power wire wheel or grinding disk. Maintain a $10^\circ$ to $15^\circ$ push or drag travel angle directly aimed at the joint sidewalls, ensuring the molten pool fully melts the underlying base metal before advancing.

Frequently Asked Questions



How long does an AWS or ASME welding certification remain valid?

A welding certification remains active indefinitely, provided your continuous continuity record is maintained. The welder must have their continuity log signed off every six months by an authorized supervisor or inspector confirming they have actively used the specific process (e.g., SMAW, GTAW) since initial testing.



What is the difference between a certified welder and a licensed welder?

A certified welder has passed a practical performance test under a specific code (such as AWS D1.1) for a specific process, thickness, and position. A licensed welder holds a legal jurisdictional permit issued by a state or city department of building safety, which often requires passing a written codebook exam in addition to practical welding certifications.



Which welding certification is best for maximizing job opportunities?

The AWS D1.1 3G/4G combination test (or 6G pipe test) using SMAW (Stick) or FCAW (Flux-Cored) offers the highest baseline versatility. These tests qualify you for a vast majority of structural steel, industrial construction, and field fabrication positions nationwide.



Can you take a welding certification test without attending a trade school?

Yes. Accredited Registrar Testing Facilities (ATFs) allow independent welders to register, pay the testing fee, and take performance qualification tests without formal trade school enrollment. However, prior hands-on experience and familiarity with reading WPS documents are strongly recommended.



What happens if you fail a welding certification test coupon?

If a coupon fails visual inspection or bend testing, codes generally allow an immediate retest under specific conditions. You must weld two consecutive test coupons of the same specification, and both must pass inspection completely. Alternatively, you may undergo additional training before re-registering for a single coupon retest.

Advance Your Fabricating Career Today

Securing an accredited welding certification proves your technical skill, commitment to safety, and code compliance to industrial employers. Locate an AWS Accredited Test Facility or ASME qualification center in your area, select your target welding code, and schedule your performance test to unlock high-paying career opportunities across structural, energy, and manufacturing sectors.


Why You Should Hire a Certified Welder - Vic's Welding

Why You Should Hire a Certified Welder - Vic's Welding

Read also: Investors are watching the JC Green market expansion very closely