Mastering ERJ Emergency Overrun And EMAS Arresting Procedures

Mastering ERJ Emergency Overrun And EMAS Arresting Procedures

Regional ICE arrests spur emergency protest in Redwood City - Redwood ...

Managing an ERJ aircraft overrun requires the precise integration of cockpit deceleration protocols and airport Engineered Material Arresting Systems (EMAS). Successful arrestment depends on maintaining a centered runway alignment and a stable entry speed below 70 knots to ensure the cellular cement blocks dissipate kinetic energy without compromising structural landing gear integrity.


Pre-Arrestment Planning and Safety Standards

Preparation for an Embraer Regional Jet (ERJ) overrun scenario begins long before the aircraft reaches the end of the paved surface. Airport authorities and flight crews must understand the specific performance envelopes of the ERJ 135, 140, and 145 variants, as their rear-mounted engines and specific weight distributions influence how the aircraft reacts to arresting materials. The foundational standard for these operations is FAA Advisory Circular 150/5220-22B, which dictates the design and maintenance of Engineered Material Arresting Systems.

Effective mitigation of a runway excursion involves a rigorous checklist of equipment and knowledge-based prerequisites. Personnel must distinguish between standard Runway Safety Areas (RSA) and EMAS-equipped zones, as the mechanical "arrest" of the aircraft differs significantly between the two.



Essential Gear and Prerequisite Standards



  • Engineered Material Arresting System (EMAS): A bed of high-quality, low-strength cellular cement blocks designed to crush under the weight of an ERJ's tires.
  • Aircraft Technical Data: Precise knowledge of the ERJ-145 Maximum Landing Weight (MLW) of 41,226 lbs (18,700 kg) and the ERJ-135 MLW of 35,273 lbs (16,000 kg).
  • Approach Speed Categories: ERJ aircraft typically operate within Category C, requiring specific runway length and safety margin calculations.
  • Towing and Recovery Equipment: Specialized high-flotation recovery mats and debogging kits specifically rated for the ERJ's landing gear geometry.
  • Duration Benchmark: A standard EMAS arrestment occurs in under 10 seconds from the moment of bed entry, though recovery and runway reopening typically require 12 to 48 hours.
  • Budgetary Impact: EMAS installation costs range from $5 million to $10 million, while a single ERJ arrestment and subsequent bed repair can cost between $500,000 and $1.5 million depending on the depth of the "arrest."

Step-by-Step Execution of an ERJ Arresting Scenario

When an ERJ 145 series aircraft exceeds the available runway length, the transition from aerodynamic braking to mechanical arrestment is critical. The following steps outline the technical requirements for the flight crew and the physical interaction with the arresting bed.



Step 1: Recognition and Directional Control

The moment a pilot realizes the aircraft cannot stop within the remaining pavement, the priority shifts from standard braking to "centering." For an ERJ, the narrow landing gear track (approximately 14 feet 5 inches) makes it susceptible to asymmetrical deceleration if the aircraft enters the EMAS bed at an angle.



  1. Maintain the aircraft on the runway centerline using rudder and nose-wheel steering.
  2. Avoid aggressive swerving to "find" more pavement; a straight entry into the EMAS is safer than an angled entry that could lead to a gear collapse or fuselage twisting.
  3. Ensure the nose wheel is centered before the transition from asphalt to the cement blocks.


Step 2: Final Configuration and Deceleration

While the EMAS is designed to do the work of stopping the aircraft, the crew must manage the ERJ’s systems to prevent secondary hazards like engine ingestion of debris or fire.



  1. Execute maximum wheel braking up until the moment of pavement exhaustion.
  2. Retract or stow thrust reversers just before entering the EMAS bed. If thrust reversers remain deployed, they may ingest the crushed cellular cement, causing catastrophic engine damage or fire.
  3. Do not attempt to "fly" out of the overrun; once the nose gear drops into the EMAS, the aircraft is committed to the arrestment.


Step 3: EMAS Bed Entry and Energy Dissipation

The physics of an ERJ "arrest" involve the tires sinking into the cellular cement blocks. These blocks are designed to provide a predictable rate of deceleration by crushing.



  1. As the nose gear enters, expect a significant and sudden deceleration force (often exceeding 0.6g to 1.0g).
  2. The ERJ's main gear, carrying the bulk of the weight due to the rear-mounted AE3007A engines, will sink deeper than the nose gear.
  3. The crew must remain strapped in and maintain a neutral control stick position to avoid over-stressing the nose-gear strut during the pitch-down moment caused by the arresting force.

Warning: Never attempt to use the ERJ's engines to taxi out of an EMAS bed. The aircraft is effectively "stuck" by design. Using engine power can spray abrasive debris into the air intakes and cause thermal damage to the surrounding arresting material.



Step 4: Post-Arrestment Shutdown and Evacuation

Once the ERJ has come to a complete stop within the EMAS, the situation transitions from an operational emergency to a rescue and recovery operation.



  1. Perform the Emergency Engine Shutdown Checklist.
  2. Assess the integrity of the airframe. Because the ERJ sits low to the ground, the passenger door (1L) may be partially obstructed by crushed blocks if the aircraft has sunk deeply.
  3. Coordinate with Airport Rescue and Firefighting (ARFF) teams. ARFF must be aware that the crushed EMAS material can be dusty and may obscure visual inspection for fuel leaks.

Pro-Tip: During the recovery phase, use the ERJ's jacking points only after the surrounding EMAS material has been cleared and replaced with load-bearing timber or mats. Lifting the aircraft while it is still "buried" in the bed can cause structural shear.


Okaloosa County drug bust leads to 5 arrests | WKRG.com

Okaloosa County drug bust leads to 5 arrests | WKRG.com

ERJ Performance Specs and EMAS Compatibility Matrix

The following table outlines the technical specifications for the ERJ family in relation to standard EMAS performance benchmarks. These values are based on an entry speed of 70 knots, which is the standard design speed for most EMAS installations under FAA Part 139 requirements.



Technical Parameter ERJ-135 ERJ-140 ERJ-145
Max Landing Weight (MLW) 35,273 lbs 36,155 lbs 41,226 lbs
Main Gear Width (Track) 14' 5" 14' 5" 14' 5"
Tire Pressure (Main) 128 psi 135 psi 151 psi
Entry Speed Limit (Design) 70 Knots 70 Knots 70 Knots
Arresting Depth (Avg) 10 - 15 inches 11 - 16 inches 12 - 18 inches
Typical Stopping Distance 240 - 310 feet 260 - 330 feet 290 - 380 feet
Max Kinetic Energy (70kt) 22.4 MJ 23.0 MJ 26.2 MJ

Troubleshooting Common Arresting Failures

In real-world aviation safety, factors like weather, maintenance, and pilot input can degrade the effectiveness of an ERJ arrest.



  • Scenario: Asymmetrical Deceleration/Ground Loop



    • Root Cause: The aircraft entered the EMAS bed at an angle greater than 15 degrees or with a significant crab angle due to crosswinds.
    • Actionable Fix: Crews must prioritize "de-crabbing" the aircraft before the pavement ends, even if it means sacrificing some braking distance to ensure a straight entry.
  • Scenario: Nose Gear Collapse upon Entry



    • Root Cause: High entry speed exceeding 80 knots or a "lip" between the runway pavement and the EMAS lead-in ramp.
    • Actionable Fix: Maintenance must ensure the EMAS ramp is flush with the runway. Pilots should avoid "pulling up" on the yoke, which can cause the nose to slam down harder once the main gear enters the bed.
  • Scenario: Insufficient Stopping Distance (Overshoot)



    • Root Cause: EMAS bed degradation due to water ingress or UV damage, causing the cellular cement to harden or lose compressive strength.
    • Actionable Fix: Implement a biannual EMAS inspection protocol using a "nuclear densitometer" or similar probe to ensure the blocks meet the original manufacturer's crush-strength specifications.
  • Scenario: Fire or Engine Ingestion during Arrest



    • Root Cause: Failure to shut down engines or stow thrust reversers prior to contact with the arresting material.
    • Actionable Fix: Update Quick Reference Handbooks (QRH) to include a "Committed to Overrun" step that mandates immediate engine cutoff if speed is low enough, or thrust reverser stowage if above 40 knots.

Frequently Asked Questions



Can an ERJ be towed out of an EMAS bed after an arrest?

No, an ERJ cannot simply be towed out because the landing gear is submerged in crushed concrete. The aircraft must be lifted using specialized pneumatic bags or jacks, and a temporary path of heavy-duty recovery mats must be laid down to move the aircraft back to the pavement.



Does the ERJ-145 have a tailhook for arresting cables?

Standard commercial ERJ-145 aircraft do not have tailhooks or cable-arresting capabilities. They rely entirely on wheel brakes, thrust reversers, and airport EMAS beds for emergency deceleration. Only specialized military variants may be equipped with such hardware.



How does weather affect an ERJ's "arrest" performance?

While EMAS is designed to work in all weather, heavy snow or ice on top of the bed can act as a lubricant, slightly increasing the stopping distance. Conversely, standing water can cause "hydroplaning" on top of the blocks before the tires finally break through and begin the crushing process.



Is an ERJ written off after an EMAS arrestment?

In the majority of cases, the aircraft is not written off. If the arrestment is performed within design speeds (under 70 knots) and on the centerline, the damage is typically limited to the landing gear, tires, and perhaps some underside antennas. After a thorough structural inspection and NDT (Non-Destructive Testing), most ERJs return to service.

Optimize Your Aviation Safety Protocols

Enhance your airport's safety margin by integrating advanced EMAS monitoring and pilot training for regional jet excursions. Ensure your ground crews are certified in ERJ-specific recovery techniques to minimize runway downtime and protect high-value airframe assets.


Flagler County arrests 10 in overdose-related drug bust ...

Flagler County arrests 10 in overdose-related drug bust ...

Read also: Remembering Charles Apple: Official Obituary and Service Details